PROBLEMS: PM WRE Practice Problems (205 Pages!)
LIST OF PROBLEMS:
- Pump curve efficiency at operating point
- Length of submerged spillway
- NRCS hydrograph + most efficient rectangular channel
- Collection system air test
- Filter bed minimum fluidization velocity
- Orifice jet clearing exterior wall
- Wet well pump cycle
- Confined aquifer -- potentiometric surface between observation wells
- Hardness and softening with non-pure chemicals
- Anaerobic lagoon HRT
- Detention tank design -- finite difference technique
- Critical oxygen sag point (time and distance)
- Runoff -- multi-parcel rational method
- Parshall flume depth
- Curb inlet length (with and without depression)
- Inclined settler SLR
- Creek flow reduction + unconfined aquifer transmissivity
- Trapezoidal channel critical and normal depths
- Pipe network pressure at a node
- Cascade design to increase D.O.
- Nitrification alkalinity requirements
- UH peak runoff from a multi-storm DRH
- Pump discharge into two tanks
- Confined aquifer -- head between two channels
- Sub/supercritical flow + curve superelevation
- Chlorine disinfection post-filtration
- Elevation of v-notch weir
- Phosphorus mass balance in lake with first-order decay
- Raw sludge production
- Pump characteristic and system formulas
- Sluice gate hydraulic jump and energy dissapation
- Hardness and softening -- annual treatment cost with pure chemicals
- Force on a curve with an angle chute
- Culvert analysis -- roadway elevation to eliminate flooding
- Infiltration basin surface area and depth
- UV disinfection reactor volume
- Pipe network -- water tower and pipe flowrate
- Unconfined aquifer -- discharge well near impermeable boundary (multiple wells)
- Multi-parcel runoff analysis with partially-full outlet pipe
- Area of constructed wetland for nitrogen removal
- Free fall jet
- Detention storage (AASHTO method)
- Stormwater inlet spacing
- Phosphorus removal with chemical precipitation
- Membrane filtration water recovery rate
- Branched reservoirs direction of flow
- Wet well active capacity
- Methane gas produced by anaerobic digestion
- Chlorine disinfection with two reactors in series
- Adjusting TMDL allocations
- Culvert overtopping flowrate
- Multi-storm DRH from UH -- size peak discharge pipe flowing 70% full
- Max height before siphon effect fails
- Water well sodium hypochlorite sterilization
- Unconfined aquifer -- discharge well near waterbody boundary (multiple wells)
- Cost to operate pump (w/ curves, power, and efficiency)
- Critical hump height in rectangular channel
- Nitrogen removal efficiency of natural wetland
- Phi- and W-indices
- Time of underground flow between two lakes
- Pump placement to avoid cavitation
- Length of combined sewer overflow weir
- Effects of channel constriction and depression on water surface elevation
- Disconnected impervious surface runoff
- Critical oxygen deficit
- Pipe network -- Hardy Cross
- Hardness and softening -- split-system design
- Spillway discharge with coefficient correction
- Unconfined aquifer -- groundwater flow characteristics between two channels
- Flowrate through culvert
- Branched reservoir system
- Infiltration and inflow
- Force on spillway curve
- Multi-outlet pond riser
- UV disinfection -- banks of lamps
205 pages of hard exam-realistic PM WRE practice problems.