PROBLEMS: PM WRE Practice Problems (Free Sample)
$0+
$0+
https://schema.org/InStock
usd
LIST OF PROBLEMS
- Pump placement to avoid cavitation
- Length of combined sewer overflow weir
- Effects of channel constriction and depression on water surface elevation
- Disconnected impervious surface runoff
- Critical oxygen deficit
- Pipe network -- Hardy Cross
- Hardness and softening -- split-system design
- Spillway discharge with coefficient correction
- Unconfined aquifer -- groundwater flow characteristics between two channels
- Flowrate through culvert
- Branched reservoir system
- Infiltration and inflow
- Force on spillway curve
- Multi-outlet pond riser
- UV disinfection -- banks of lamps
A variety of PM-level exam-realistic and tough practice problems for the WRE. Good luck on your exam!
Size
4.76 MB
Length
45 pages
Add to wishlist